Sector

SEN

Services

Architect & Lead Designer
Landscape Design

Client

Kier Construction - London

Value

£4.3 million

Contract

PSPB - Design & Build

Innovations

Modular Construction
Reduced construction programme
Site of protected species
Designed around the existing building retained during construction.

Sustainable Features

Photovoltaics
Very Good’ BREEAM ‘
Super Insulation / Low Air Leakage
Compliance with the London Plan

Concept

In separating the two student groups, it was decided to place the Primary elements at ground floor and Secondary at first, with a shared front of house area. This facilitated external learning space immediately outside each classroom for the Primary group. The accommodation required for Secondary was far smaller than the ground floor, leading to the building’s varied massing.

Text Text